Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Vauxhall Insignia VXR – UK Debut at Goodwood

Tue, 23 Jun 2009

Vauxhall Insignia VXR makes its UK public Debut at the Goodwood Festival of Speed The Vauxhall Insignia VXR was revealed in April as a 325bhp version of the very good Insignia. Featuring adaptive four wheel drive and an electronic limited slip diff., the handling is also aided by a 10mm lower suspension setup than the standard Insignia, and HiPerStrut front suspension which keeps torque steer in check. Vauxhall XVR Concept The Insignia VXR manages the 0-60 sprint in 5.8 seconds and a limited top speed of 155mph.

Lexus, puppets unveil LF-NX concept at Frankfurt motor show

Wed, 11 Sep 2013

Ten years ago, a Danish face-paint enthusiast by the name of King Diamond released a concept album set in 18th-century Budapest (that's in Hungary). An evil puppetmaster turned human beings into puppets. King explains it here.

Green Light For More Smart Motorway Schemes

Wed, 09 Jul 2014

THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.